Space || NASA || ISS – Telegram
Space || NASA || ISS
305 subscribers
2.78K photos
4.34K links
Space(NASA)'s Daily, including:
- Photos
- Daily report
- Breaking news
- Astronauts enter/exit ISS

Powered by IFTTT & Telegram.
Download Telegram
New Companies Join Growing Ranks of NASA Partners for Artemis Program
NASA has added five American companies to the pool of vendors that will be eligible to bid on proposals to provide deliveries to the surface of the Moon through the agency’s Commercial Lunar Payload Services (CLPS) initiative.

November 18, 2019
via Space https://ift.tt/2Xp50BC
NASA Highlights Science on 19th SpaceX Resupply Mission to Space Station
NASA will host a media teleconference at 1 p.m. EST Wednesday, Nov. 20, to discuss select science investigations launching on the next SpaceX commercial resupply flight to the International Space Station.

November 18, 2019
via Space https://ift.tt/334H4ow
Milky Way over Uruguayan Lighthouse
via NASA https://ift.tt/2KxfbyK
NASA Announces Ninth Consecutive Clean Financial Audit Opinion
The NASA Office of the Chief Financial Officer (OCFO) has led the way for an unmodified audit opinion on the agency’s fiscal year 2019 (FY 2019) financial statements. This represents NASA’s ninth consecutive "clean" opinion from an independent accounting firm – the highest opinion possible.

November 19, 2019
via Space https://ift.tt/35mww5H
ISS Daily Summary Report – 11/18/2019
Alpha Magnetic Spectrometer (AMS) Upgraded Tracker Thermal Pump System (UTTPS):  Today, the USOS crew transitioned the UTTPS from its launch configuration to its on-orbit configuration. To achieve this, the USOS crew transferred the UTTPS to the Japanese Experiment Module (JEM) and bungeed it to the JPM1D6 (JEM Pressurized Module Deck 6) location. Once the UTTPS …

November 19, 2019 at 12:00AM
via Space https://ift.tt/2QyNBoQ
Arp 273: Battling Galaxies from Hubble
via NASA https://ift.tt/2rTyjjY
ISS Daily Summary Report – 11/19/2019
Alpha Magnetic Spectrometer (AMS) Upgraded Tracker Thermal Pump System (UTTPS):  Today, the USOS crew transitioned the UTTPS from its launch configuration to its on-orbit configuration. To achieve this, the USOS crew transferred the UTTPS to the Japanese Experiment Module (JEM) and bungeed it to the JPM1D6 (JEM Pressurized Module Deck 6) location. Once the UTTPS …

November 20, 2019 at 12:00AM
via Space https://ift.tt/2QE0hdN
Simeis 147: Supernova Remnant
via NASA https://ift.tt/2D3lw0J
ISS Daily Summary Report – 11/20/2019
AMS-02 (Alpha Magnetic Spectrometer) EVA Preparation: The crew continued preparation for the AMS repair EVAs with procedure reviews.  The multiple AMS-02 repair EVAs are being performed to recover a series of cooling pumps within the AMS-02 experiment. The first of the series of EVAs occurred last Friday. The second EVA is scheduled to occur this …

November 21, 2019 at 12:00AM
via Space https://ift.tt/2Day725
Edward Gonzales: Advocating for Underserved Communities
via Space https://ift.tt/2QCKwDZ
Orion Rising
via NASA https://ift.tt/2QHOR8Y
ISS Daily Summary Report – 11/21/2019
AMS-02 (Alpha Magnetic Spectrometer) EVA Preparation: The crew continued preparation for the AMS repair EVAs completing a multitude of prep tasks including the crewlock prep work, tool configurations, suit review, procedure reviews and a crew conference.  The multiple AMS-02 repair EVAs are being performed to recover a series of cooling pumps within the AMS-02 experiment. …

November 22, 2019 at 12:00AM
via Space https://ift.tt/37usGcs
Hubble Eyes an Emitting Galaxy
via Space https://ift.tt/2KLnsz9
Apollo 12 and Surveyor 3 Stereo View
via NASA https://ift.tt/34fqWBF
NGC 6995: The Bat Nebula
via NASA https://ift.tt/35yM1XY
Astronauts Complete 2nd Phase to Repair Alpha Magnetic Spectrometer
via Space https://ift.tt/2pNSW0j
NASA Awards Program Analysis and Control V Contract
NASA has awarded an 8(a) small business set-aside contract to ASRC Federal Systems Solutions, LLC, in Beltsville, Maryland, for services that support planning and managing of NASA missions, projects, and programs.

November 25, 2019
via Space https://ift.tt/34i2dNm
Venus and Jupiter on the Horizon
via NASA https://ift.tt/2XSeSEb
ISS Daily Summary Report – 11/25/2019
AMS EVA preparation: The crew continued preparation for the third AMS repair EVA with procedure reviews.  The multiple AMS-02 repair EVAs are being performed to recover a series of cooling pumps within the AMS-02 experiment. The first and second of the AMS EVAs were completed successfully and went very well. The third EVA is currently …

November 26, 2019 at 12:00AM
via Space https://ift.tt/33nJyON
Inspiring a New Generation of Astronauts
via Space https://ift.tt/33nQtHL
NASA Invites Media to SpaceX In-Flight Abort Test for Commercial Crew
Media accreditation is open for SpaceX’s In-Flight Abort Test as part of NASA’s Commercial Crew Program. The flight test of SpaceX’s Falcon 9 rocket and Crew Dragon spacecraft is targeted for no earlier than December – an exact test date still is to be determined -- from historic Launch Complex 39A at NASA’s Kennedy Space Center in Florida.

November 26, 2019
via Space https://ift.tt/2KYgw1X