Which process results in the project funding requirements document as one of its outputs?
Anonymous Quiz
24%
Estimate activity resources
16%
Estimate activity durations
28%
Estimate costs
32%
Determine budget
هولاء الاسئله مهمين جدا دورت لهن من موقع وشفت ان اغلب اختبارت الدكتور السابقه من نفس الموقع
🫡14👍2🔥2
تكنولوجيا المعلومات مستوى ثالث | جامعة صنعاء
هولاء الاسئله مهمين جدا دورت لهن من موقع وشفت ان اغلب اختبارت الدكتور السابقه من نفس الموقع
ونعم بالفزعات اللي تطيب الخاطر 🤩🫡🫡
🫡7
The cost of quality includes all of the following except:
Anonymous Quiz
35%
Buying professional indemnity insurance.
24%
The cost of inspecting and appraising conforming products produced by the project.
19%
The cost of defects and rework caused by failing to achieve requirements.
23%
Preventing non-conformance to requirements.
During project executing, a team member comes to the project manager because he is not sure of what work he needs to accomplish on the project. Which of the following documents contain detailed denoscriptions of work packages?
Anonymous Quiz
47%
WBS dictionary
14%
Activity list
25%
Project scope statementProject scope statement
14%
Scope management plan
👍1
Which of the following is not correct about initial phase of a project?
Anonymous Quiz
39%
The cost associated at the beginning of the project is highest
29%
Stakeholders have maximum influence during this phase.
32%
The highest uncertainty exists at the beginning of the project.
🫡2
Which is normally not regarded as an element of cost of quality?
Anonymous Quiz
16%
Prevention costs.
31%
Maintenance costs.
26%
Appraisal costs
27%
Failure costs.
👍2🕊2
When do bidder conferences normally take place?
Anonymous Quiz
14%
After the contract has been awarded to keep alternatives open.
29%
After submission of bid or proposal, but before contract award.
29%
Prior to the submission of a bid or proposal by the bidder.
28%
After technical meetings with bidders to discuss contract requirements.
🕊2
What is true for modern project management? Project managers need ...
Anonymous Quiz
17%
to have a strict standing in negotiating.
43%
to show experience in tricking business partners.
24%
to be team players and facilitators
16%
to be strongly linked to local traditions.
👍1🤩1
You have been criticized that certain specifications in your scope statement do not pass the test for SMART objectives. What are SMART objectives?
🔥2🤔2
What is a common result of poor project planning?
Anonymous Quiz
12%
Wasted effort
12%
Lost time
10%
Increased cost
66%
All of the above
👍1🤩1
Which of the following aspects of planning has the most processes and is concerned with decomposing the work of a project into manageable portions?
Anonymous Quiz
37%
Scope
21%
Time
10%
Cost
31%
Quality
👍1🤩1
You are a project manager newly assigned to a large project for your organization. The project charter has been signed, and the stakeholders have been identified. What should you do next?
Anonymous Quiz
24%
Ask appropriate team members to submit WBS input
36%
Initiate the scope planning process
34%
Start the develop project management plan process
6%
Begin the activity definition process
The project scope management plan, as a component of the project management plan, includes which of the following?
Anonymous Quiz
10%
Preparation of a detailed project scope statement
27%
Creation of the work breakdown structure (WBS)
16%
Specifications for formal verification and acceptance of completed project deliverables
47%
All of the above
What does a project scope statement document?
Anonymous Quiz
13%
What work is to be completed during the project
15%
What deliverables need to be produced by the project
59%
Both A and B
13%
Neither A nor B
The work breakdown structure (WBS) does all of the following except
Anonymous Quiz
9%
Organizes and defines the entire scope of the project
13%
Divides the project into smaller, more manageable tasks
42%
Serves as a high-level planning tool for work planned but not yet approved
36%
Both A and B
🤔4
Which of the following is an output of the collect requirements process?
Anonymous Quiz
24%
Scope management plan
35%
Requirements management plan
14%
Requirements risk breakdown
28%
Requirements traceability matrix
Which of the following is NOT a tool and technique for the develop schedule process?
Anonymous Quiz
18%
Critical path method
29%
Alternatives analysis
37%
Resource leveling
16%
Schedule compression
🤔2✍1👍1
وبك اصبحَنا والقلوّب تسَألك عوناً
وترجوَك لطفاً فيسَر لنا كل خيرَ يا الله
صبــــاح النجــاح مهمــــا كانــــت التحـديات 🙂...
وترجوَك لطفاً فيسَر لنا كل خيرَ يا الله
صبــــاح النجــاح مهمــــا كانــــت التحـديات 🙂...
🔥10💯3🕊2🤔1
شباب ايش رأيكم في حالة انهم جابوا لنا الإختبار نسبة وتناسب اليوم كلنا نعلنها الانتفاضة ضد هذا القرار ونجتمع في باب الكلية حتى لو نروح إلى رئاسة الجامعة 😅
🔥9💯5👍2